Tag Archives: MTB Trails

Soft Surface Trails as Transportation

Anchorage Trails Plan: Final Call for Input

COMMENTS DUE MARCH 31st, 2026

COMMENT HERE: https://publicinput.com/l2316

The 2026 Anchorage Recreational Trails Plan is a strong step forward for trails across Anchorage and Chugiak-Eagle River. Chugach Mountain Bike Riders supports the plan’s emphasis on improving connections between communities and access to recreational opportunities.

There are just a few days left to weigh in before the March 31 deadline. Two small but important additions would make the plan stronger.

What We’re Asking For

1. Make Parallel Singletrack a Standard Design Tool

The draft recognizes the need to separate faster riders and pedestrians on busy corridors, including the addition of a new Class 6 paved trail type with separated bicycle and pedestrian lanes. However, it stops short of fully adopting a model that is already working well in Anchorage: parallel singletrack.

This approach—adding a narrow dirt trail alongside a paved or gravel multi-use path, as seen along Chester Creek Trail—improves safety, increases capacity, and provides a better user experience without requiring full corridor widening.

The plan should:

  • Explicitly support parallel progressive soft-surface singletrack alongside existing and future multi-use paths.
  • Treat this as a standard design option for new corridors and upgrades.

Suggested comment: “Please include parallel progressive soft-surface singletrack as a standard design option alongside multi-use paths, consistent with existing Anchorage trails like the Chester Creek Singletrack.”

2. Add MTB Singletrack to existing Ski Trails at Eagle River High School

The draft includes an excellent plan for a multiuse trail to connect Eagle River campground to the Lower Eagle River Trail. This trail would follow existing ski trails at Eagle River High School and continue parallel to the Eagle River Loop Rd to connect back to the river trail at Briggs Bridge and the Eagle River Greenbelt Access trail.

Current Chugach State Park plans include new nordic ski trails and new mountain bike singletrack at the Eagle River Campground. It makes sense that this proposed combined nordic-MTB trail system continue from the campground through the existing ski trails at Eagle River High School.

The plan should:

  • Add MTB singletrack to the existing ERHS ski trail system.

Suggested comment: “Please add mountain bike singletrack to Project ID 63 at Eagle River High School, consistent with Chugach State Park’s singletrack plans at the adjacent Eagle River Campground.”

Trail Building Starts July 16th!

We are happy to announce that phase two trail construction will begin July 16th!

This year we have new TRAIL CREW hats to recognize folks who volunteer at least 10 hours on phase two trail building crews.

We hope to see you all sporting one!

VOLUNTEER TRAIL CREWS MEET THURSDAYS 6:30-8:30pm!

NO EXPERIENCE NECESSARY!

1. Thursday July 19th 6:30-8:30pm

2. Thursday July 26th 6:30-8:30pm

3. Thursday Aug 2nd 6:30-8:30pm

4. More dates to be announced.

We meet at the Mirror Lake Singletrack Trailhead at the north end of the parking lot, the far end away from the lake.Come out and join us!

Late September Work Parties.

edmondstrails_9_14layersWe’ve got about 1/2 mile of trail left to cut, and also need to clears hazards along the entire system.  Join us at the second trail crossing on Camp Gorsuch Rd for our semi-weekly trail building sessions!

WEDS SEP 21st 6-8pm

SUN SEP 25th 1-4pm

WEDS SEP 28th 6-8pm

Bring work gloves and a lopper if you have one.  Youth under 18 will need a parent signature.

If you have a group that would like to come out and help, you may join us on our regular work days, or we can schedule a special session for you.

Thanks!

Weekend Mirror Lake MTB Trail Building Volunteer Work Parties

cmbr4Hooray! We’ve got a few weekend work parties for you all!

Sunday Sep 11th, Saturday Sep 17th, and Sunday Sep 25th all from 1-4pm. Meet on Camp Gorsuch Rd at the 2nd trail crossing (before the Boy Scout Camps – the link on the map is a little too far down the road).

We have a lot more root cutting, trail raking and slope smoothing to do. Bring work gloves, a lopper or hand pruner if you have one, and youth under 18 will neeed a parent signature.

Goal: Hand/Tool work for finishing sections of newly cut trails.

We will continue to need volunteers every Wednesday 6-8:30pm, and either Saturday or Sunday from 1-4pm until the trails are completed or we reach our termination date in late September or early October.

MTB trail building at Mirror Lake #4

Join Chugach Mountain Bike Riders, Alaska Trails and Ptarmigan Ptrails for our weekly Wednesday night trail building work parties! We are putting in the first 3 miles of mountain bike flow trails at Mirror Lake Park before the snow flies! Bring work gloves. Youth need a parent signature on their waiver form. Thanks!

We have had dozens of volunteers turn out for the first three workdays and have been able get almost half of the trails completed, but we can still use all the help we can get!

WHERE: Mirror Lake Park, Mirror Lake Spur, Chugiak, AK (Take the Mirror Lake exit off the Glenn Hwy. Meet at the Alaska Trails tool trailer in the parking lot furthest from the lake.)

WHEN: Wednesday, September 7th, 6:30-8:30pm – Rain or Shine!